TMS
Background
Being not costly distribution transformers, utility companies don’t care that big number of outage potentials. Losing each distribution transformer normally at the pick time will reduce total revenue as well as customer satisfaction while cost-effective monitoring of such transformers provides live tracking to prevent any transformer failure.
Solution Overview
Hexing' Transformer Monitoring System (TMS) is designed based on state-of-the-art multi-functional gateway which accurately measures electrical parameters of transformer' LV side, manages belonging smart PLC or RF residential meters (as a DCU) and monitor transformer' oil or even control relevant feeder/transformer ( up to 800A).
This advanced TMS unit has 2 types for the cases that utility wants to monitor the transformer and manage smart meters or monitor transformer, manage smart meters with extra ability of remote switching. Basic unit measures secondary side of transformer via portable Rogowski CTs and advanced type does same measurement but via normal split-core CTs installed in the box. Collected load, network and oil data will be securely transferred to the utility over GPRS/3G/4G or even Ethernet cable.
Except asset management that is the main concern of Hexing TMS, there are other applications like peak shaving, loss monitoring (a key tool of ATC&C system) and Feeder monitoring, all to optimize smart grid structure.
-
HXEJ200
-
HXEJ201
-
XTC-S400
-
HHU
Key Benefits
Enhancing network reliability
Outage reduction
Asset optimization
Demand management
Installation and commissioning' costs reduction through unique combined TMS unit (DCU+TMU+CB)
Facilitation of distribution network' maneuver
Load balancing Enhancement
Street lighting management
Project value
· 集约化、多位一体设计节约了初始投资
· 集成gateway功能,为智能电网假设铺路
· 主站系统采集详尽的变压器运行数据,包括电能质量参数和总电能数据
· 基于运行数据的智能分析,为电力公司建议预防性维护计划
· 实现台区线损计算和跟踪分析
· 设备插拔式安装,易于维护,无需对现有变压器进行改造